Scope of application: | Suitable for bus lanes, sidewalks, non motorized vehicle lanes, tunnels, highway speed bumps, overpasses, bus bays, long downhill slopes, sharp turns, toll station passages, and emergency stop zones on highways |
Coating characteristics: | Paint curing agent has fast curing time, easy construction operation, and low odor |
Excellent water resistance and good flexibility |
Excellent chemical corrosion resistance |
Good temperature resistance and extremely high slip resistance |
Excellent interlayer adhesion, high bonding strength with concrete base surface |
TECHNICAL INDEX | Drying time - surface drying: ≤ 4H |
Drying time - practical: ≤ 6H |
Pencil hardness: ≥ 2H |
Wear resistance (750g/500r): ≤ 0.02g |
Adhesion (grid method): Level 1 |
Climate aging resistance (no foaming, no yellowing, no cracking after 800 hours): qualified |
Resistant to 3% saline solution: no significant change for 7 days |
Water resistance: No significant change after 7 days |
Resistant to 20% sodium oxide gas: no significant change after 7 days |
Resistant to gasoline 120 #: No significant change after 7 days |
Construction procedures | construction method | Main materials - auxiliary materials | Reference amount |
Plain ground | Color coated polymer road anti slip adhesive layer with trowel coating |
| 1-2 12-16 mesh) |
undercoat | Solvent free epoxy resin coating for quartz stone repair, after curing, use sandpaper to polish and level, and clean the ground | DS-705 | About 2-2.5kg/m2 |
Seal the concrete pavement with a special primer, and apply colored primer after the primer is completely dry | DS-400 | 0.5-0.75kg/m²左右 |
Ceramic particle layer | Sprinkle colored wear-resistant aggregate on the surface of the colored base adhesive | DS-400- Quartz sand | 2-2.5kg/m²
|
top coat | Evenly sprinkle the particles and completely cover the base adhesive. After 2-3 hours, clean the excess particles on the surface | DS-143 | 3-5kg/m2 |
|
Construction procedures | Coating thickness: generally 1mm-3mm. If it exceeds 2mm, it needs to be sandblasted |
Personnel can only enter after 24 hours of construction completion, and heavy pressure can only be applied after 72 hours. (Based on 25 * C, the low-temperature opening time needs to be moderately extended) |