Scope of application: | Suitable for electroplating plants, breweries, vinegar plants, battery plants, chemical plants, soy sauce plants, wastewater treatment tanks, acid-base neutralization tanks, chemical storage areas, etc |
Coating characteristics: | The surface of the layer is flat and smooth |
Seamless, dust-free, and easy to clean surface |
Has excellent chemical resistance |
Good mechanical strength |
Sufficient flatness and decorative properties |
TECHNICAL INDEX | Drying time - surface drying: ≤ 4H |
Drying time - practical: ≤ 24 hours |
Pencil hardness: ≥ 3H |
Impact resistance (500g steel ball): 50g'cm |
Wear resistance (750g/500r): ≤ 0.03g |
Compressive strength: ≤ Grade 1 |
Resistant to 15% acidity and alkalinity: no significant change for 7 days |
31% salt tolerance: no significant change after 7 days |
Resistant to 10% nitric acid: no significant change after 7 days |
Resistant to 10% acetic acid: no significant change after 7 days |
Resistant to 10% sodium oxide gas: no significant change after 7 days |
Resistant to 5% ammonium fluoride: no significant change after 7 days |
Resistant to gasoline 120 # and ammonia water: no significant change after 7 days |
Construction procedures | construction method | Main materials - auxiliary materials | Reference amount |
Plain ground | Do a good job in waterproofing treatment |
|
|
undercoat | Scrape and apply epoxy primer | DS-30# | About 0.15kg/m ² |
screed | Scrape the mortar layer with medium coating and quartz sand | DS-400- Quartz sand | 0.25-0.7kg/m²
|
Putty layer | Apply putty layer with intermediate coating and scraping | DS-400 | 0.15kg/m2 once |
top coat | Roll coating anti-corrosion flat coating topcoat | DS-810 | 0.65kg-0.7/m2 |
After completion, the overall floor will be bright and clean, with uniform color and no hollowing |
|
Construction procedures | Coating thickness: generally 1mm-3mm. If it exceeds 2mm, it needs to be sandblasted |
Personnel can only enter after 24 hours of construction completion, and heavy pressure can only be applied after 72 hours. (Based on 25 * C, the low-temperature opening time needs to be moderately extended) |