Scope of application: | Suitable for parking lots, slopes, oil stained workshops, waterlogged workshops, and artistic floors that require anti slip measures |
Scope of application: | Preparation of solvent-free epoxy resin with high-quality curing agent |
Specially suitable for heavy industry flooring |
Particle surface, anti slip and easy to maintain |
Coating resistance to impact, weather resistance, and long-lasting service life |
TECHNICAL INDEX | Drying time - surface drying: ≤ 4H |
Drying time - practical: ≤ 24 hours |
Pencil hardness: ≥ 2H |
Impact resistance (500g steel ball): through g.cm |
Wear resistance (750g/500r): ≤ 0.02g |
Resistance (grid method): ≥ Level 2 |
Resistant to 3% saline solution: no significant change for 7 days |
Resistant to 10% sulfuric acid: no significant change after 7 days |
Resistant to 20% sodium oxide gas: no significant change after 7 days |
Resistant to gasoline 120 #: No significant change after 7 days |
Construction procedures | construction method | Main materials - auxiliary materials | Reference amount |
Plain ground | Do a good job in waterproofing treatment |
|
|
undercoat | Roll coated epoxy primer | DS-30# | About 0.15kg/m ² |
screed | Add quartz sand to scrape and apply epoxy intermediate coating | DS-400- Quartz sand | 0.25-0.6kg/m²
|
Putty layer | Scrape and apply putty layer | DS-400 | 0.10kg/m2 once |
top coat | Roll coated epoxy topcoat layer | DS-670 | 0.15-0.18kg/m²
|
After completion, the overall floor will be bright and clean, with uniform color and no hollowing |
| 0.3-0.6kg/m² |
|
Construction procedures | Coating thickness: generally 1mm-3mm. If it exceeds 2mm, it needs to be sandblasted |
Personnel can only enter after 24 hours of construction completion, and heavy pressure can only be applied after 72 hours. (Based on 25 * C, the low-temperature opening time needs to be moderately extended) |