Epoxy galvanized iron primer (two-component)

Epoxy galvanized iron primer (two-component)

Detailed introduction

Product compositionA two-component primer for non-ferrous metals is made by grinding epoxy resin, zinc containing color, coupling agent, and bulk material, adding special additives, organic solvents, and curing agents
Product FeaturesGood adhesion between galvanized sheet metal, aluminum alloy sheet metal, zinc sheet and non-ferrous metals, tough paint film, good water resistance and salt water resistance
scope of applicationUsed as a protective primer for indoor and outdoor non-ferrous metals (such as aluminum alloys and galvanized sheets), suitable for industrial plants and commercial buildings constructed with billboards and galvanized sheets, hardware constructed with aluminum alloys, industrial machinery components, and building profiles for protective coating
Physical parametersNon volatile matter content (curing agent) - ≥ 40%   
Hardness (pendulum method) ---- ≥ 0.5  
Salt water resistance - (immersed in 3% NaCl for 24 hours) without foaming, rusting, or peeling 
Fineness (scraper left) ------- ≤ 40 µ m  
Color and appearance - Zinc yellow, smooth paint film  
Adhesion (circle drawing method) ------- ≤ Level 2    
Drying time - surface drying ≤ 4h; actual drying ≤ 24h 
Construction reference1. Surface treatment: Sandblasting and shot blasting to remove oxide scale, rust, and oil stains, reaching Sa2.5 or St3 levels
2. Substrate temperature: 3 ℃ above dew point          
3. Coating methods: Brushing, rolling, spraying, high-pressure airless spraying
4. Diluent: Adjust the epoxy paint diluent to the appropriate viscosity for use
5. Coating thickness: Mix evenly according to the proportion of A and B, cure for 20 minutes before construction, apply 1-2 coats, dry film thickness 20-40um
7. Re coating interval time: about 12 hours at 25 ℃
8. Rear supporting paint: nitro enamel, acrylic enamel, polyurethane enamel
safety rulesThe construction site should have good ventilation facilities
Construction personnel should wear protective equipment such as masks, glasses, gloves, etc. to avoid skin contact and inhalation of paint mist and solvents
Smoking is strictly prohibited on the construction site, and all sources of fire must be isolated
Storage periodSealed storage in a cool and dry place, with a shelf life of 12 months. If it exceeds the shelf life and passes inspection, it can still be used


Photos of

Copyright © 2014-2099 MouMouJianCai All rights reserved   IPC:Guangdong ICP No. 2024342108-1