Product compositionA two-component coating composed of specialized fluorocarbon resin, high weather resistant pigments and fillers, additives, and organic solvents |
|
Performance and Usage | The paint film has high hardness, good leveling and fullness, strong color retention, and good adhesion; Excellent weather resistance and strong pollution resistance: excellent decorative properties |
Widely applicable for coating outdoor steel structures and equipment such as ultra-high weather resistant building steel structures, bridges, highway guardrails, high-end outdoor furniture, etc. It can also be used for exterior wall coating with high protection and decorative requirements, and is an excellent outdoor weather resistant and anti-corrosion coating product |
Technical Parameter | Dry film thickness -40 µ m |
Maturity time -10-15 minutes |
Applicable time -2 hours (25 ℃) |
Proportion - Component A: Component B=10:1 (weight ratio) |
Theoretical dosage -8-10 ㎡/kg (calculated based on a dry film thickness of 40 µ m) |
Drying time (25 ± 1 ℃) - surface drying ≤ 4 hours; Practical work ≤ 24 hours |
Viscosity (25 ℃) ≥ 1000 mPa. s (component A) |
Interval time for recoating | One dish per day (25 ℃) |
Front supporting paint | Two component sealing primer, epoxy zinc rich primer, epoxy anti rust paint or epoxy intermediate paint |
Substrate temperature | 3 ℃ above dew point |
instructions | 1. The previous coat of paint must be completely dry, and the surface of the workpiece must be degreased and cleaned. For the two-component paint film that has been cured for a long time, it is necessary to polish it with fine sandpaper before applying a topcoat |
2. Mix the components A and B in a ratio of 10:1.5 (by weight), stir thoroughly, and add 15-40% of the matching solvent according to the construction situation to adjust the construction viscosity. Filter through a 100 mesh sieve and let it stand for 10-15 minutes before use |
3. When using air to coat construction elbows, construction equipment and compressed air should be dehydrated to avoid affecting the quality of the paint film |
4. After mixing two components, they should be used up within the specified time |
5. Construction temperature above -5 ℃ C, construction humidity not exceeding 85%, and severe weather conditions such as rain, snow, and sandstorms, outdoor painting cannot be carried out |
6. Painting methods: spray coating, roller coating, brush coating |
7. To ensure quality, please use the matching fluorocarbon paint thinner |
Storage period | Sealed storage in a cool and dry place, with a shelf life of 12 months. If it exceeds the shelf life and passes inspection, it can still be used |