Product composition | A two-component coating composed of chlorosulfonated polyethylene resin, modified epoxy resin, anti-corrosion pigments, fillers, additives, solvents, etc |
Performance and Usage | Dry quickly; High hardness; Strong adhesion and good mechanical properties; Excellent protection performance and outstanding three proof performance; Good supporting performance |
Used for steel structures, pipelines, storage tanks, machinery and other equipment, as well as for anti-corrosion coating in chemical plants, fertilizer plants, power plants, refineries, paper mills, and sewage treatment plants |
Technical Parameter | Non volatile matter - ≥ 23% |
Composite coating resistant to 30% NaOH (30d) - no foaming, no rusting, no peeling |
Composite coating resistant to 30% H2SO4 (30d) - no foaming, no rusting, no peeling |
Composite coating resistant to 30% NaCl (30d) - no foaming, no rusting, no peeling |
Salt water resistance (3% NaCl, 4d) - no foaming, no rusting, no peeling, slight color loss allowed |
Color and appearance - The color tone is unpredictable, and the paint film is smooth and even |
Specific gravity - approximately 1.22kg/L
|
Impact strength -50kg.cm |
Flexibility - ≤ 1mm |
Adhesion (circle drawing method) ------- ≤ Level 1 |
Drying time - surface drying ≤ 0.5 hours; Practical work ≤ 24 hours (under 25 ℃ conditions) |
Construction reference | 1. Surface treatment: The previous paint film is completely dry, removing all oil stains on the paint film |
2. Substrate temperature: 3 ℃ above dew point |
3. Painting methods: brush coating, roller coating, spray coating |
4. Diluent: Special diluent for chlorosulfonated polyethylene paint adjusted to appropriate viscosity for use |
5. Coating thickness: Generally, two coats are recommended, with a dry film thickness of 50 µ m |
6. Theoretical dosage: approximately 5.2 ㎡/kg (based on a dry film of 30 µ m) |
7. Re coating interval time: 6 hours at 25 ℃, with no maximum limit |
8. Rear supporting paint: chlorosulfonated polyethylene primer |
safety rules | The construction site should have good ventilation facilities |
Construction personnel should wear protective equipment such as masks, glasses, gloves, etc. to avoid skin contact and inhalation of paint mist and solvents |
Smoking is strictly prohibited on the construction site, and all sources of fire must be isolated |
Storage period | Sealed storage in a cool and dry place, with a shelf life of 12 months. If it exceeds the shelf life and passes inspection, it can still be used |